Unlabeled

Merging early vs. late before a closed lane, in a traffic model of I-65, Alabama

In this traffic model, merging 1.1 miles before the closure added 2.0 to 2.2 times as much 5 p.m. delay as merging at it. At 3 a.m., neither way won at every length.

What does this axis measure?
What does this axis measure?
Merging early vs. late before a closed lane, in a traffic model of I-65, Alabama: 20 points, a several lines chart.
Reveal the axesHide the axes
y ↑
Extra delay vs. no work zone (%)
x →
Length of the closed lane (feet)
Lines
Early merge, 5 p.m. · Late merge, 5 p.m. · Early merge, 3 a.m. · Late merge, 3 a.m.
Show the story, the data and the sourceHide the story, the data and the source
The data: 20 points
Length of the closed lane (feet)Extra delay vs. no work zone (%)Line
500346.19Early merge, 5 p.m.
1,000361.64Early merge, 5 p.m.
1,500370.79Early merge, 5 p.m.
2,000380.85Early merge, 5 p.m.
2,500408.9Early merge, 5 p.m.
500158.36Late merge, 5 p.m.
1,000164.13Late merge, 5 p.m.
1,500173.69Late merge, 5 p.m.
2,000186.74Late merge, 5 p.m.
2,500198.69Late merge, 5 p.m.
50052.7Early merge, 3 a.m.
1,00043.24Early merge, 3 a.m.
1,50060.31Early merge, 3 a.m.
2,00082.6Early merge, 3 a.m.
2,50086.02Early merge, 3 a.m.
50049.24Late merge, 3 a.m.
1,00054.4Late merge, 3 a.m.
1,50085.85Late merge, 3 a.m.
2,00082.25Late merge, 3 a.m.
2,50071.53Late merge, 3 a.m.
Source
University of Alabama at Birmingham (Sisiopiku and Ramadan, 2017), Evaluation of Traffic Control Options in Work Zones, STRIDE project 2016-001, Table 3-3; via the U.S. Department of Transportation's ROSA P repository
Licence
Figures (facts) read from a university research report sponsored by the U.S. DOT; no text or figure of it is copied
Read
2026-11-20
Drawn
20 points as the puzzle showed them · several lines
  • Ran in puzzle #60 on November 25, 2026. Play it